Completed Projects

Buildings



  Project Name        Construction of Buildings at Oluvil under South Eastern University Development Project Phase 1 A.
  Location within Country Oluvil, Ampara District
  Start Date (Month/Year)  July 2008
  Completed Date  (Month/Year) March 2013
  Client  Ministry of Higher Education  

Description of Project :

    This project envisages improving the facilities of Universities affected by the Tsunami Disaster on 26th Dec. 2004 which includes
  • (a) Construction of Building Complex for Student Hostels (500 rooms)
  • (b) Construction of Building Complex for Health Center
  • (c) Construction of Building Complex for Faculty of Islamic Studies and Arabic
  • (d) Construction of Sports and Athletic Ground and Pavilion
  • (e) Construction of Building Complex for Faculty of Information Technology
  • (f) Construction of Building Complex for Student Center Construction of Staff Accommodation
 

Description of Services Provided:

  • 1) Schematic Design Phase
  • Obtain Client’s statement of requirements. Analysis of the Structures, Establish design criteria and develop the schematic design based on the approved outline design proposal, Estimate approximate construction cost and obtain Client’s approval.
  • 2) Design Development Phase
  • Design and preparation of detailed architectural and Structural drawings.
  • 3) Construction Document Phase
  • Finalize contract strategy. Prepare Architectural, Structural and other Engineering services working drawings. Prepare Bills of Quantities and technical specifications of materials and workmanship. Submit Draft tender documents to the Client for review and approval by the Technical Evaluation Committee and the Tender board and revise them if necessary
  • 4) Bidding and/or Negotiating Phase
  • Assist and facilitate Client on Tender Document Issue, Conduct Pre-Bid meeting. Evaluate Bids received and prepare Consultancy reports on Bids received and assist Client in Awarding projects to the selected contractors.
  • 5) Construction Supervision Phase
  • Select and employ adequate resident supervisory staff. Carry out periodic inspection of work to monitor quality and progress of work, Certification of contractor’s bill.

 

       

.