Completed Projects

Buildings Projects



  Project Name        Establishment of Uva Wellassa University
  Location within Country Badulla
  Start Date (Month/Year)  June 2005
  Completed Date  (Month/Year) JUne 2011
  Client  Government Analyst’s Department  

Description of Project :

Multi storied Academic, Administration Buildings, Hostel Complexes, Net Work including IT Backbone, Roads, Play Ground, Water Supply & Sewerage disposal Systems and other Miscellaneous Buildings. The project was offered on a turnkey basis to the CECB. The scope of works included the full spectrum of activities from preparation of the Master Plan to Detail Design and Construction.


Description of Services Provided:

    CECB is responsible for providing following services;

  • Analysis of the structure, design and preparation of detailed structural drawings.
  • Design and preparation of detailed water supply, sewerage and drainage system for buildings.
  • Design and preparation of detailed drawings for services such as electrical system with minimizing energy consumption, air conditioning systems, telecommunication & information technology (IT Backbone).
  • Provision of quantity surveying services including preparation of BOQ, specifications, special conditions of contracts and tender documents.
  • Construction supervision, project planning and progress monitoring.
  • Design the Road Network.
  • Construction works of entire project.

.