Completed Projects

Irrigation



  Project Name        Design and Construction of an Earth Dam and Reservoir for Irrigation (Sumeda Tank)
  Location within Country Monaragala
  Start Date (Month/Year)  January 2014
  Completed Date   (Month/Year) December 2014
  Client  Irrigation Department Sri Lanka  

Description of Project :


A 50 m long and 15.0m high earth dam built ona tributary of Hulandawaoya. The overflow section was located on a saddle point of the reservoir rim with a 33.0m long concrete section built over the saddle.Water is used for irrigation purposes.

Description of Services Provided:

Detail Site Surveys.
Detail Geological investigations.
Detail Design of the dam and spillway and sluice gates.
Environmental Impact Assessment study.
Construction of the dam.
       

.